Residential & commercial builds
New construction
plumbing
Complete blueprint planning, ground-rough-ins, and code-perfect trim installations — from slab stub-ups and underground utilities through to the final fixture set.
Plans first
New construction plumbing is decided long before anyone cuts pipe. Fixture counts drive line sizing, line sizing drives fixture-unit loading, and both drive where the stacks and vents can physically go once the framing is set. Reading that off the drawings and coordinating it with the other trades is what keeps a rough-in from becoming a re-do.
We work from your blueprints, flag conflicts before they are poured or framed, and give the general contractor a schedule that fits the build rather than fighting it.
Underground and ground rough-in
The below-slab phase is the one you cannot revisit cheaply. Waste and vent runs are set out, graded, supported and pressure-tested before the pour, and stub-ups are located to the drawing rather than approximately. Our recent work includes trenching through existing commercial slabs, exposing and tying into under-slab cleanouts, and setting stub-up groups across a finished pad.
- Site utility coordination and trenching
- Water service and sewer lateral installation
- Under-slab waste and vent, graded and tested
- Cleanout placement to code and to access
- Stub-up layout, sleeving and slab penetrations
- Inspection sign-off before the pour
Above-ground rough-in and top-out
Once the frame is up, the water lines, drain and vent stacks go in through stud walls and overhead framing — strapped, isolated where they cross metal, and set so the drywall and the fixture heights actually work out. On the commercial side that means running through steel studs and roof framing without compromising the structure or the fire-rating, and coordinating with mechanical and electrical in the same ceiling space.
- Copper, CPVC and PEX water distribution
- PVC and cast iron DWV stacks and branches
- Overhead runs through steel and timber framing
- Fixture carriers, backing and blocking coordination
- Hose bibbs, hydrants and equipment connections
- Water heater and mechanical room rough-in
- Pressure and air testing at every stage
Trim and final set
Trim is where the build gets judged. Fixtures set level and plumb, escutcheons tight, stops accessible, flush valves adjusted, and everything commissioned and tested under real conditions before handover. On a commercial fit-out that includes the full restroom group: pans, urinals, flushometers, lavatories and ADA clearances checked against the drawing.
Permits and inspections
Progressive Plumbing Solution Inc. holds Florida certified plumbing contractor license #CFC1434532, and the work is done to code because code is what the inspection checks and what the certificate of occupancy depends on. We handle the permitting and inspection sequence as part of the job rather than leaving it with the builder.
Planning a build or a fit-out? Call (786) 439-4935 or send the plans over and we will work up a scope. See also commercial plumbing.
On the job
Rough-in and buildout work
-
Copper water lines and PVC drain and vent stacks roughed into metal stud walls before drywall -
Copper and PVC risers roughed in through a commercial stud wall with the pipe supports strapped off -
Overhead PVC drain and vent lines run through steel roof framing on a commercial shell -
PVC waste and vent stub-ups standing out of a finished concrete slab against a block wall -
PVC drain lines set at slab level with the stack run up a finished interior wall -
Commercial plaza unit with the plumbing layout marked out in paint across the slab -
Finished commercial restroom with a tiled wall, grab bar, floor-mounted toilet and wall-hung urinal