Our jobs, our photos

Recent work
in Miami-Dade

Every photograph on this page is one of our own jobs, taken on site by the crew that did the work. Water heaters, copper mains, commercial rough-ins, under-slab drain lines and finished fixture sets.

No stock photography, no borrowed portfolio. 30 photographs from Progressive Plumbing Solution Inc. jobs, grouped by the kind of work. Captions describe what is in the frame — we do not publish customer names or addresses.

8 photos

Water heaters

Related service
  • Wall-mounted tankless water heater with new copper hot and cold lines, isolation valves and a yellow gas connection
    Wall-mounted tankless water heater with new copper hot and cold lines, isolation valves and a yellow gas connection
  • Gas storage water heater with a new draft hood and flue vent connected above it
    Gas storage water heater with a new draft hood and flue vent connected above it
  • Electric storage water heater installed in a utility alcove with new supply lines run overhead
    Electric storage water heater installed in a utility alcove with new supply lines run overhead
  • Top of a water heater showing new copper nipples, flexible connectors and a fresh electrical whip
    Top of a water heater showing new copper nipples, flexible connectors and a fresh electrical whip
  • Replacement water heater set in place with the copper hot and cold lines re-run to the ceiling
    Replacement water heater set in place with the copper hot and cold lines re-run to the ceiling
  • Water heater safety pan fitted into a closet floor before the tank is set, ready for its drain line
    Water heater safety pan fitted into a closet floor before the tank is set, ready for its drain line
  • Compact point-of-use water heater mounted on a wall with copper supply lines and a flexible conduit
    Compact point-of-use water heater mounted on a wall with copper supply lines and a flexible conduit
  • Water heater rough-in against a block wall with the supply lines, drain and electrical disconnect set
    Water heater rough-in against a block wall with the supply lines, drain and electrical disconnect set

7 photos

Commercial & new construction

Related service
  • Copper water lines and PVC drain and vent stacks roughed into metal stud walls before drywall
    Copper water lines and PVC drain and vent stacks roughed into metal stud walls before drywall
  • Copper and PVC risers roughed in through a commercial stud wall with the pipe supports strapped off
    Copper and PVC risers roughed in through a commercial stud wall with the pipe supports strapped off
  • Overhead PVC drain and vent lines run through steel roof framing on a commercial shell
    Overhead PVC drain and vent lines run through steel roof framing on a commercial shell
  • PVC waste and vent stub-ups standing out of a finished concrete slab against a block wall
    PVC waste and vent stub-ups standing out of a finished concrete slab against a block wall
  • PVC drain lines set at slab level with the stack run up a finished interior wall
    PVC drain lines set at slab level with the stack run up a finished interior wall
  • Commercial plaza unit with the plumbing layout marked out in paint across the slab
    Commercial plaza unit with the plumbing layout marked out in paint across the slab
  • Finished commercial restroom with a tiled wall, grab bar, floor-mounted toilet and wall-hung urinal
    Finished commercial restroom with a tiled wall, grab bar, floor-mounted toilet and wall-hung urinal

6 photos

Underground & drain lines

Related service
  • PVC drain line laid in an open trench cut through the slab of a commercial interior
    PVC drain line laid in an open trench cut through the slab of a commercial interior
  • Excavated pit exposing a PVC cleanout and combination fitting on an under-slab drain line
    Excavated pit exposing a PVC cleanout and combination fitting on an under-slab drain line
  • Excavator working alongside a house with lengths of new pipe laid out ready to go in the trench
    Excavator working alongside a house with lengths of new pipe laid out ready to go in the trench
  • Two crew members in high-visibility shirts hand-digging to expose an underground line beside a building
    Two crew members in high-visibility shirts hand-digging to expose an underground line beside a building
  • Cleared building site with a surveying tripod set up and excavators positioned for utility trenching
    Cleared building site with a surveying tripod set up and excavators positioned for utility trenching
  • Graded building pad with excavators on site before the underground utility runs go in
    Graded building pad with excavators on site before the underground utility runs go in

4 photos

Fixtures & restrooms

Related service
  • Newly installed undermount vanity basin with a chrome faucet set and mirror above
    Newly installed undermount vanity basin with a chrome faucet set and mirror above
  • Chrome P-trap and angle stops fitted neatly beneath a wall-hung lavatory
    Chrome P-trap and angle stops fitted neatly beneath a wall-hung lavatory
  • Wall-hung urinal set on a tiled wall with the flush connection roughed in above it
    Wall-hung urinal set on a tiled wall with the flush connection roughed in above it
  • Chrome flushometer valve installed on a new fixture still in its factory wrapping
    Chrome flushometer valve installed on a new fixture still in its factory wrapping

5 photos

Copper & repiping

Related service
  • Copper main riser run vertically through a commercial pipe chase alongside insulated ductwork
    Copper main riser run vertically through a commercial pipe chase alongside insulated ductwork
  • Soldered copper tee assembly clamped to a wall with the branch lines squared off
    Soldered copper tee assembly clamped to a wall with the branch lines squared off
  • Close detail of soldered copper fittings and a brass valve body on a finished riser
    Close detail of soldered copper fittings and a brass valve body on a finished riser
  • Copper riser turned out of a mechanical shaft ceiling and dropped to serve the floor below
    Copper riser turned out of a mechanical shaft ceiling and dropped to serve the floor below
  • Mechanical room pipework with copper branches, gate valves and galvanised risers tied together
    Mechanical room pipework with copper branches, gate valves and galvanised risers tied together

Talk to a plumber

Want work like this on your property?

Tell us what you are dealing with and we will tell you what it takes. Progressive Plumbing Solution Inc. covers Miami-Dade County with mobile service units and around-the-clock emergency dispatch.

(786) 439-4935 Request Service

Mon – Sat, 7:00 am – 7:00 pm · 24/7 emergency dispatch

Call (786) 439-4935 Send us aMessage